

 
 

Home | CEC Overview | Feasibility Studies | Plant Services | Process
  Engineering | Engineering Services | Project Services | Technology Development | Studies 
  Client Project Representative | Registration | Contact us | Useful Links | Engineering Search | Engineering Unit Conversions
  | Previous Page | Next Page
 New Projects:
 New Projects:
 Process Design and Optimization
 Process Design and Optimization 
 Control System Philosophy and The Selection of Key Hardware
 Control System Philosophy and The Selection of Key Hardware
 Selection of Key Design Features and Decision on the Key Parameters
 Selection of Key Design Features and Decision on the Key Parameters
 Selection of Key Mechanical Equipment Packages
 Selection of Key Mechanical Equipment Packages
 Project Codes, Standards and Criteria
 Project Codes, Standards and Criteria
 Detailed Plan for Project Execution
 Detailed Plan for Project Execution
 Design Base Manuals
 Design Base Manuals
 Bid Documents for Tendering EPC Contractor and Equipment Packages
 Bid Documents for Tendering EPC Contractor and Equipment Packages

 Methanol & Ammonia Retrofit Projects:
 Methanol & Ammonia Retrofit Projects:
CEC's experience base in methanol and ammonia plant design, engineering and operations enables the company to undertake 
complex retrofit projects. The following is a typical list of these services: 
 Methanol and Ammonia Converter Upgrade
 Methanol and Ammonia Converter Upgrade
 CO2 Recovery from Reformer Flue Gas
 CO2 Recovery from Reformer Flue Gas
 Pre-reforming of the Reformer Process Gas Feed
 Pre-reforming of the Reformer Process Gas Feed
 Incorporating Process Gas Saturator
 Incorporating Process Gas Saturator
 Reformer Debottlenecking Studies and Recommendations
 Reformer Debottlenecking Studies and Recommendations
 Debottlenecking Studies for Distillation and Recommendations
 Debottlenecking Studies for Distillation and Recommendations
 Debottlenecking Rotating Equipment and Peripherals
  Debottlenecking Rotating Equipment and Peripherals
 Plant Capacity Upgradation and Performance Testing
 Plant Capacity Upgradation and Performance Testing 
 Plant Optimization Studies, Theoretical and Operational
 Plant Optimization Studies, Theoretical and Operational
 S/C Ratio Optimization
 S/C Ratio Optimization
 Fugitive Methanol Emissions and Spillage from Distillation
 Fugitive Methanol Emissions and Spillage from Distillation
 Integration of a Turboexpander
 Integration of a Turboexpander 
 Partial Oxidation Combined with a Purge Gas Turboexpander
 Partial Oxidation Combined with a Purge Gas Turboexpander
 Ultra Low NOx Burners for Reformers
 Ultra Low NOx Burners for Reformers
 Zero Liquid Effluent Discharge
 Zero Liquid Effluent Discharge
 Interlock Trip System Logic Review, Improvements and Hardware Assessment
 Interlock Trip System Logic Review, Improvements and Hardware Assessment
 Methanol Production from a New Reactor Installed on the Purge Stream
 Methanol Production from a New Reactor Installed on the Purge Stream
 Procedures for Monitoring the Age of Plant Equipment
 Procedures for Monitoring the Age of Plant Equipment
 Reformer Remaining Tube Life Assessment
 Reformer Remaining Tube Life Assessment 
 Assessment of Plant Operations, Operability and Reliability Studies
 Assessment of Plant Operations, Operability and Reliability Studies
 Catalyst Activity Evaluation and Recommendations.
 Catalyst Activity Evaluation and Recommendations.
 Safety and Reliability Studies:
 Safety and Reliability Studies:
 Safety-in-Design
 Safety-in-Design
 RAM Analysis
 RAM Analysis
 PHA and HAZOP Studies
 PHA and HAZOP Studies
 Operability Studies
 Operability Studies
 Criticality Analysis
 Criticality Analysis
 Kepner Tregoe Decision Analysis
 Kepner Tregoe Decision Analysis
 HSE Reviews and Analysis Including Workplace Exposure Limits. Refer to EU exposure limits as typical
 HSE Reviews and Analysis Including Workplace Exposure Limits. Refer to EU exposure limits as typical
 Plot Plan Reviews and Operability Studies
 Plot Plan Reviews and Operability Studies
 Early Project Deliverables:
 Early Project Deliverables:
 Firewater Requirements and Firewater System Design
 Firewater Requirements and Firewater System Design
 Pipeline Pressure Surge and Waterhammer Analysis
 Pipeline Pressure Surge and Waterhammer Analysis
 Drainage Requirements, Ponds, Tailings, Winterization, etc.
 Drainage Requirements, Ponds, Tailings, Winterization, etc.
